E.ON has secured planning permission from the Highland Council to build a new 47.5MW onshore wind farm near Garve in the Scottish Highlands.
The wind farm will consist of 19 turbines which can provide renewable electricity to power approximately 21,000 homes every year.
E.ON regional director of renewables in the UK Dave Rogers said the development will not only provide clean renewable electricity for Scotland, but will also enable the nation to meet its renewable energy targets.
Currently, the company is building two onshore wind farms in the Highlands, one near Caithness and the other at Rosehall.
The company also owns and operates a biomass power station in Lockerbie and Robin Rigg, which was completed in 2010.
Earlier E.ON also won the exclusive right to explore the potential for new wind energy projects on two lots of land owned by Forestry Commission Scotland.
Welcome to Wind trap Limited where we aim to save you energy by helping you generate you own energy by using wind turbines or solar PV panels while saving you energy with energy saving appliances and LED lights. We supply home users, farms, allotment societies, marine and classroom educational teaching aids for schools, colleges and universities.
Showing posts with label scotland. Show all posts
Showing posts with label scotland. Show all posts
Thursday, 24 March 2011
Thursday, 24 February 2011
Energy provider E.ON has won the exclusive right to explore land owned by Forestry Commission Scotland
Energy provider E.ON has won the exclusive right to explore the potential for new wind energy projects on two lots of land owned by Forestry Commission Scotland (FCS).
E.ON estimates that the two awarded lots located in the north and west of Scotland have the potential to generate around 500MW or enough renewable electricity to power more than 270,000 homes annually, based on an average annual domestic household consumption of 4,700kWh.
Read more: http://www.theengineer.co.uk/sectors/energy-and-environment/eon-wins-right-to-develop-wind-energy-on-scottish-lots/1007546.article#ixzz1EsshhoSV
E.ON estimates that the two awarded lots located in the north and west of Scotland have the potential to generate around 500MW or enough renewable electricity to power more than 270,000 homes annually, based on an average annual domestic household consumption of 4,700kWh.
Read more: http://www.theengineer.co.uk/sectors/energy-and-environment/eon-wins-right-to-develop-wind-energy-on-scottish-lots/1007546.article#ixzz1EsshhoSV
Subscribe to:
Posts (Atom)