Friday, 18 July 2014

Sanyo Air Conditioning GHP Gas Service Kits

Sanyo Air Conditioning GHP Gas Service Kits




We supply the gas service kits for Sanyo GHP Air Conditioning units including the following models:
< W MULTI > SGP-EW120M2G2W, SGP-EW150M2G2W, SGP-EW190M2G2W, SGP-EW240M2G2W,
< 3WAY MULTI >SGP-EZ150M2G2, SGP-EZ190M2G2, SGP-EZ240M2G2,
< G POWER W MULTI > SGP-EGW190M2G2W

                
All GHP models and sizes have a service interval of 10.000 hours. Generally the lifetime is calculated for max. 30.000 hours. If the GHP is used for cooling & heating all year round take care about operating hours! One year = 8.760 hours. If the project will result in such a kind of operation the GHP is not suited for this need as it would mean replacement of the unit after only 3,5 years. Normally operating hours should not exceed 2.000 – 3.000 hours a year! It is recommended to use the timer functions for stopping operation at weekend, holiday, night time etc. As GHP basic operation principle is to keep stable room temperatures by smooth operation (low rpm.) it is very important to keep in mind this point for economic long time operation.


The GHP Service Kit Includes:



638 012 7993

1

Sanyo / Panasonic Oil FilteAssy (GHP)
623 196 0564
1
Sanyo / Panasonic Air Cleaner Element (GHP)
923 194 7665
4
Sanyo / Panasonic Spark Plug
638 018 9625
1
Sanyo / Panasonic Compressor Operation Belt
923 200 4602
10
Sanyo / Panasonic Oil Absorbant Mat
623 300 8660
1
Sanyo / Panasonic Oil Absorbant Tube
160962020
3
Sanyo / Panasonic MN125 GHP Oil (20 litres)

Delivery to UK mainland destination - £10.00
For other territories please email us for a quotation
All models kits are exactly the same, irrespective of the model numbers.  The only difference is the required oil quantity, J series only require 20 litres of oil; K and M series require 50 litres of oil each.

GHP Service Manuals:

Sanyo Support Pages:


Contact Us:
Tel: +44(0)845 567 7080

Acta S.p.A Product Development Partnership and New Customer Sale

RNS Number : 2918M
Acta S.p.A.
15 July 2014
15 July 2014
Acta S.p.A. ("Acta" or "the Company")
Product Development Partnership and New Customer Sale
Acta S.p.A (AIM: ACTA), the hydrogen energy company, announces a product development partnership with Dantherm Power A/S ("Dantherm"), a subsidiary of Ballard Power Systems Inc (NASDAQ: BLDP), to develop a self-recharging fuel cell backup power system to address the significant opportunities for off-grid backup power in cold and remote geographic regions where traditional power sources suffer from severe drawbacks.
Initially, Acta will support Dantherm to integrate Acta's EL 1000 electrolyser with Dantherm's fuel cell backuppower system. Once integrated, the combined device will be deployed on an island location close to the Arctic Circle, where it will be powered by a wind turbine. Shipment of the order is scheduled for September 2014.
Following previous demonstrations of the capabilities of Acta's system in arid and humid environments, the project is expected to demonstrate the suitability of Acta's electrolyser products for renewable energy storageapplications in challenging cold environments. The Company and Dantherm are already in discussion regarding a number of suitable opportunities across the Nordic region.
Paolo Bert, CEO of Acta, commented: "We have been discussing technical collaboration with Dantherm for some time and we are pleased to be going ahead together with this installation. We see a significant opportunity for fuel cell backup power systems for remote locations including cold environments, where the ability to generate hydrogen onsite from renewable power sources is a key enabler.
"We also note Ballard's recent announcement regarding an engineering services agreement between Dantherm and M-Field Energy, our system integration customer in Taiwan, to enter the European material handling systems market, and believe that this channel collaboration will strengthen our leadership in onsite hydrogen generation for energy applications. We look forward to the success of the partnership with Dantherm and to extending our reach into the telecommunications backup power market together with them."

ITM Power Notice of Final Results for the Year to 30 April 2014

RNS Number : 7841L
ITM Power PLC
09 July 2014
9 July 2014
ITM Power plc
("ITM Power" or "the Company")
Notice of Final Results for the Year to 30 April 2014
ITM Power (AIM: ITM), the energy storage and clean fuel company, announces that it will be reporting results for the year to 30 April 2014 on Monday, 28 July 2014.
There will be a briefing for analysts and investors on Monday, 28 July at the offices of Tavistock Communications, 131 Finsbury Pavement, London EC2A 1NT. To attend the briefing, please register using the contact details below.
For further information please visit www.itm-power.com or contact:
 
ITM Power plc 
 Graham Cooley, CEO                 0114 244 5111 
Zeus Capital 
 Tim Metcalfe (Nominated Adviser) 
 John Goold (Institutional Sales)   020 7533 7727 
Tavistock Communications 
 Simon Hudson / James Collins       020 7920 3150 
 
About ITM Power plc:
ITM Power plc was admitted to the AIM market of the London Stock Exchange in 2004 and raised its initial funding of GBP10m gross in its IPO. Further funding rounds of GBP28.5m in 2006, GBP5.4m in 2012, GBP2m in 2013 and GBP10m in 2014 have been completed. The Company has now made the transition from a research and development company to a product manufacturer and technology provider. The Company has both a strong base of intellectual property and engineering expertise for providing complete hydrogen solutions.
www.itm-power.com
-ends-

Tuesday, 18 March 2014

Parker Air Conditioning And Refrigeration Spare Parts

Parker Air Conditioning And Refrigeration Spare Parts



Parker Refrigeration and Air Conditioning SPARE PARTS DELIVERY WORLDWIDE including USA, Europe, Canada, South and central America, Africa, Australia and most of Asia.



Parker Refrigeration and Air Conditioning  SPARE PARTS DELIVERY WORLDWIDE



We can ship Parker air conditioning and refrigeration spare and parts including controllers, expansion valves, refrigeration valves, refrigerant oil management, refrigerant couplers, level controls, acid pumps, compressors, solenoid valve, air cooled condensing units, pressure switch, remote condensing units, open compressors, transport refrigeration, semi hermetic spare parts, water cooled condensing units parts. Please call or email us your unit model number and required part. We will then contact you with the price, availability and shipping cost.



Contact:

Call: +44(0)845 567 7080

E-mail: Info@orionair.co.uk 

Friday, 14 March 2014

Case Study of Air conditioning Heat-pump installation at Amey Utilities Waterbeach, Cambridge (14/03/14)

Amey Utilities Office Air Conditioning Case Study

Installation of Amey Utilities office air conditioning heat-pumps:

Orion air conditioning & refrigeration ltd complete the installation of a Fujitsu air conditioning heat-pump heating system for the cabin office building in Waterbeach, Cambridgeshire. The cabin building was in need of revamping due to its age and had 5 areas which needed heating and cooling including a data server room. The building had around 200 meters/squared of area that used a electric convector heating system which was as basic and extremely expensive to run.

Project Pictures:

  


What air conditioning heat-pumps were installed in Amey Utilities offices and server room:


Background of the Amey Utilities office air conditioning heat-pumps:

The main contractor conducting the refit was P.B Doyles who were quoted on various heating systems including split heat pump systems and replacement electric heaters which came in under budget in comparison to the price of the Fujitsu air conditioning Heat-Pump units but did not offer cooling which the cabin office would need in the summer. The Fujitsu air conditioning heat-pump system provided a great value way of heating a office building within a short space of time (30 mins heat up time) and with little cost and reduces CO2 emissions. The Fujitsu  air conditioning systems offer large capacity heating with excellent COP. The Amey project required individual heating and cooling for each area and split Fujitsu systems offer a affordable way of heating and cooling without the need for centralized air conditioning system.
Office air conditioning VRF Heat-pump efficiency and CO2 emissions:

This office air conditioning heat-pump system took around half an hour to heat fully but once warm the outdoor heat-pump ramped down because the temperature  had been reached therefore just pumping small amounts of heat in to maintain heat. Typical running cost for the year / system £474.50p.

For a list of our client have a look at our About Us section

Call: +44(0)845 5677080          

E-mail: Info@orionair.co.uk



ITM Power plc Injection of Hydrogen into the German Gas Distribution Grid 04 December 2013

RNS Number : 6226U
ITM Power PLC

4 December 2013

("ITM Power" or "the Company")

ITM Power (AIM:ITM), the energy storage and clean fuel company, is pleased to announce that, with its partners Mainova Aktiengesellschaft and NRM Netzdienste Rhein-Main GmbH, the Company has injected hydrogen into the German gas distribution network. The ITM Power rapid response electrolyser plant has been delivered and commissioned ahead of schedule and the compliance and permitting work has been completed to enable the incorporation of hydrogen via the compliant mixing plant.
According to an announcement made in Germany by the Thüga Group:
"During the current commissioning phase of the Thüga Group's power-to-gas demonstration plant, the system injected the first ever electrolytically generated hydrogen into the Frankfurt am Main gas distribution network. This represents the first ever plant to convert electricity into hydrogen and subsequently inject the hydrogen into the German gas distribution network. "The system worked as planned, so much so that we will go into trial operation in the very near future ahead of final commissioning at the start of 2014" Michael Riechel, Member of the Board of Thüga Aktiengesellschaft said.
By the end of 2016, the partners will have gained experience of how the system works under real-world conditions. The project partners are badenova AG & Co. KG, Erdgas Mittelsachsen GmbH, Energieversorgung Mittelrhein GmbH, erdgas schwaben gmbh, ESWE Versorgungs AG, Gasversorgung Westerwald GmbH, Mainova Aktiengesellschaft, Stadtwerke Ansbach GmbH, Stadtwerke Bad Hersfeld GmbH, Thüga Energienetze GmbH, WEMAG AG, e-rp GmbH and Thüga Aktiengesellschaft, which acts as project coordinator. The operational phase will be accompanied by scientific partners, whose involvement is being funded by the Hessian Ministry for the Environment, Energy, Agriculture and Consumer Protection.
H2 Injection without Compression
The core of the system is an ITM Power proton exchange membrane (PEM) electrolyser. The electrolyser converts electrical energy into chemical energy, which in turn facilitates the storage of electricity. A gas mixing plant ensures that the proportion of hydrogen in the natural gas stream does not exceed two per cent by volume, the technically permissible maximum value when a natural gas filling station is situated in the local distribution network. The electrolyser supplies the hydrogen-methane mixture at the same pressure as the gas distribution network, namely 3.5 bar. "We were thus able to avoid using a compressor and save costs," said Riechel.
The plant is located on the premises of Mainova Aktiengesellschaft in Schielestraße in Frankfurt am Main. The project partners decided to deploy a PEM system, as this technology, in comparison with alkaline systems, uses water rather than a potassium hydroxide solution, and is therefore more environmentally friendly. In addition, the system can respond more quickly to changes in the electrical load. A further advantage is the unit'scompact design (2.45m high, 6m long, 3.30m wide, weighing 10 tons). The power consumption of the electrolyser is 315 kilowatts. It produces about 60 cubic meters per hour of hydrogen and thus in one hour can feed 3,000 cubic meters of hydrogen-enriched natural gas into the network.
Power-to-Gas Project Platform
13 companies of the Thüga Group have combined their collective know-how and capital in a project platform to invest jointly in the development of power-to-gas storage technology. The focus is on testing the feasibility of power-to-gas technology. The companies are confident that in the long-term, this offers the greatest potential for storing excess renewable energy. To this end, the group is collectively developing, building and operating its own demonstration plant in Frankfurt am Main over a three-year period (2012 - 2016). The plant converts electricity into hydrogen and then stores this in the gas distribution network. Overall, the partners will invest more than EUR1.5m. The project is financially supported by the Hessian Ministry for the Environment, Energy, Agriculture and Consumer Protection. Following the first phase of this project, the partners will consider a second project, in which hydrogen will be generated and combined with carbon dioxide to form synthetic methane to be directly injected and stored in the natural gas grid. For more information see www.energie-und-wende.de."
ITM Power has deployed its PEM Electrolysis P2G plant at the Mainova Aktiengesellschaft site in Schielestrasse, Frankfurt am Main where the compliant gas mixing and grid injection infrastructure designed and built by NRM was already in place. This plant is part of the Thüga Group's Power-to-Gas (P2G) project as previously reported, which was jointly commissioned by 13 partners within the Thüga Group to investigate P2G energy storage. The install also includes a monitoring facility and visitor's reception so that members of the Thüga Group can examine the performance of the plant.
Phil Doran, MD of ITM Power GmbH commented: "ITM Power is delighted to be have performed the first ever injection of hydrogen into the German gas grid using a PEM electrolyser with our partners in the Thüga Group, and look forward to the official commissioning early next year."

ITM Power plc Five hydrogen refuelling sites approved for planning on the Isle of Wight 07 February 2014

ITM Power PLC
07 February 2014
7(th) Febuary2014
ITM Power plc
("ITM Power", "the Group" or the "Company")
Five hydrogen refuelling sites approved for planning on the Isle of Wight
ITM Power, the energy storage and clean fuel company is pleased to announce achievement of planning permission for five hydrogen refuelling sites on the Isle of Wight.
ITM Power has been granted planning permission for an 80kg/day hydrogen refuelling station at four locations and at one for a 15kg/day marine refuelling station. All planning applications submitted on the Isle of Wight have been successful. ITM has chosen two of these sites to take forward for installation of hydrogen refuellers ready for operation in November 2014, as part of the EcoIsland Hydrogen Vehicle Refueller project on the Isle of Wight, supported by funding from the UK's innovation agency, the Technology Strategy Board.
The approvals process involved several stages including the identification of candidate sites prior to conducting a detailed survey, preparation of plans together with a Design and Access Planning Statement and liaison with stakeholders including the Isle of Wight Council and the Environment Agency.
The sites surveyed included two owned by Vestas; one being their R&D centre at Stag Lane and the other Monks Brook, one operated by Scotia Gas Networks in East Cowes, and one at the St Cross Business Park, Newport. The marine refueller is to be sited on the dock-side at Cheetah Marine in Ventnor. ITM Power has decided to proceed with the site owned by Scotia Gas Networks, providing an opportunity to further develop commercial links with SGN.
ITM Power sits on three Working Groups of the ISO Technical Committee 197, which has as its stated scope the standardization in the field of systems and devices for the production, storage, transport, measurement and use of hydrogen. Furthermore, ITM Power sits on the British Compressed Gas Association Technical Steering Committees with particular emphasis on Code of Practice 41, which addresses "The Design, Construction, Maintenance and Operation of Filling Stations Providing Gaseous Fuels".
Dr Graham Cooley, Chief Executive of ITM Power, said: "The expertise required to achieve planning permission and satisfy compliance bodies is often underestimated. I am delighted that ITM has been successful in gaining approval to commence the build of two hydrogen refuelling stations on the Isle of Wight. Furthermore, the continued support from the Isle of Wight council and their determination to become a prime location for hydrogen fuel cell vehicle deployment provides a fantastic backdrop to this exciting project."